Text description provided by the architects. The new library in Grimstand has a central, waterfront location. It lies between the old town and the new town center. The intention is for the library to not only be a place to read and borrow books, but for the building to become a social meeting point with the opportunity to host a variety of cultural events. The building is accessible for all.
![Grimstad Library / Helen & Hard - Interior Photography, Closet, Shelving](https://images.adsttc.com/media/images/5bcf/6e96/f197/cc4d/db00/024c/medium_jpg/Sindre_Ellingsen_11.jpg?1540320902)
The context acts as an important driver for the architecture. The building acts as a covered walkway connecting the old town in the north and new town center in the south. This passageway is filled with a public and cultural programme for all the towns inhabitants and visitors to enjoy.
![Grimstad Library / Helen & Hard - Image 21 of 24](https://images.adsttc.com/media/images/5bcf/6f44/f197/cc4d/db00/0252/newsletter/Grimstad_Library_Floorplan1_1-200.jpg?1540321085)
![Grimstad Library / Helen & Hard - Interior Photography, Chair, Beam](https://images.adsttc.com/media/images/5bcf/6ef4/f197/cc21/0f00/0134/medium_jpg/Sindre_Ellingsen12.jpg?1540320995)
![Grimstad Library / Helen & Hard - Image 22 of 24](https://images.adsttc.com/media/images/5bcf/6f5d/f197/cc21/0f00/0137/newsletter/Grimstad_Library_Floorplan2_1-200.jpg?1540321110)
An existing building on the site, together with the budget, formed a limited framework for the project. However, this limitation was looked upon as a positive; the old structure is partially kept and acts as foundations for the new light timber structure. The compact volume of the building has a rational timber structure. The timber frames are placed with a spacing of 3m on top of the existing concrete building.
![Grimstad Library / Helen & Hard - Image 8 of 24](https://images.adsttc.com/media/images/5bcf/6ecf/f197/cc21/0f00/0133/newsletter/Sindre_Ellingsen_2.jpg?1540320961)
The building is organized over three floors. The main library functions on the first floor with a secluded children’s area on the second. The administration is found on the ground floor. Additionally the building houses a café, auditorium and exhibition spaces. These are in close proximity to toilet facilities making it possible to close off this zone for evening events.
![Grimstad Library / Helen & Hard - Image 23 of 24](https://images.adsttc.com/media/images/5bcf/6f79/f197/cc4d/db00/0255/newsletter/Grimstad_Library_Section_A__1-200_.jpg?1540321137)
By varying the vertical north-facing openings between the prefabricated east and west facing panels makes a dynamic façade. This portrays the interior movement, while the building negotiates between new and old.